Well, started a man cave project and with covid killing summer I am going all in solo. So far I have a 40x52 dug out and moving gravel. I am using ez forms and was wondering if anyone has experience with “helix” additive in the cement instead of laying rebar?

I made the decision to spend more on material and do it myself vs labor, some days I feel like that was a mistake, but love that it will be made by me.

Sips walls
ez forms and floor heat
rafters, blow insulation, and steel roof - interior and exterior
bathroom, septic - code sucks on this and may just do holding tank🤫.
floor drains
bar

any ideas or mistakes made for list above let me know.
 


Duckslayer100

Founding Member
Founding Member
Joined
Aug 11, 2015
Posts
4,611
Likes
189
Points
293
Location
ND's Flatter Half
Floor heat: Are you running tubing for a boiler, or going electrical? Also, if you have a bar, will you be running water there? Might not be a bad idea to do something like a combi-boiler to run both your floor heat and have hot water at the tap. Also, consider hanging a unit heater to supplement. The floor heat should be enough on most days, but if it's really cold having that heater to take the edge off will help. Plus you can keep it at 50-55 all fall/winter, and crank it when you're planning to use the space. A shop heater heats much more quickly than a floor heating system.
 

Obi-Wan

Founding Member
Founding Member
Joined
May 15, 2015
Posts
7,495
Likes
2,524
Points
678
Location
Bismarck
Well, started a man cave project and with covid killing summer I am going all in solo. So far I have a 40x52 dug out and moving gravel. I am using ez forms and was wondering if anyone has experience with “helix” additive in the cement instead of laying rebar?

I made the decision to spend more on material and do it myself vs labor, some days I feel like that was a mistake, but love that it will be made by me.

Sips walls
ez forms and floor heat
rafters, blow insulation, and steel roof - interior and exterior
bathroom, septic - code sucks on this and may just do holding tank狼.
floor drains
bar

any ideas or mistakes made for list above let me know.

Helix is junk stay with the rebar and you won't be sorry
 


SDMF

Founding Member
Founding Member
Joined
Apr 24, 2015
Posts
10,908
Likes
620
Points
438
Floor heat: Are you running tubing for a boiler, or going electrical? Also, if you have a bar, will you be running water there? Might not be a bad idea to do something like a combi-boiler to run both your floor heat and have hot water at the tap. Also, consider hanging a unit heater to supplement. The floor heat should be enough on most days, but if it's really cold having that heater to take the edge off will help. Plus you can keep it at 50-55 all fall/winter, and crank it when you're planning to use the space. A shop heater heats much more quickly than a floor heating system.

If you need to to be more than 55 degrees in a shop, you don't need a shop, you need a knitting nook.

- - - Updated - - -

If you used any of the online design tools, double the lighting, shadows suck donkey-balls when you're trying to work. Triple the outlets, you may find that you move stuff around vs. you original plan, having power where you need it is CHEAP up front. In a shop that size I'd probably have at least 4 50Amp plugs, you may not have 4 devices that need 220V power, but, it's nice to have the power and therefore the device where you need it vs. where an outlet will allow it. 6-8 outlets in the ceiling w/drop-down/retractable extension cords.

Assuming you'll have a compressor, I'd have air plumbed to both ends with at least 50' of air-hose on a reel @ either end. Assuming you'll have an overhead door, 100' of air-hose @ that end isn't a bad plan so you can use compressed air outside when/if you need it.
 

Kurtr

Founding Member
Founding Member
Joined
Apr 12, 2015
Posts
18,239
Likes
1,971
Points
648
Location
Mobridge,Sd
Well, started a man cave project and with covid killing summer I am going all in solo. So far I have a 40x52 dug out and moving gravel. I am using ez forms and was wondering if anyone has experience with “helix” additive in the cement instead of laying rebar?

I made the decision to spend more on material and do it myself vs labor, some days I feel like that was a mistake, but love that it will be made by me.

Sips walls
ez forms and floor heat
rafters, blow insulation, and steel roof - interior and exterior
bathroom, septic - code sucks on this and may just do holding tank狼.
floor drains
bar

any ideas or mistakes made for list above let me know.

helix as in fiber mesh. In walls I would not use it. In the floor i have no problem using it
 

Retired Educator

★★★★★ Legendary Member
Joined
May 4, 2016
Posts
3,226
Likes
183
Points
273
Location
North Dakota
All good ideas above. Outlets, air, or anything that is inside the walls os much cheaper to install now versus after the walls are finished. Agree that floor heat at 55 degrees is good for a shop. But if you walk in and want the heat warmer that floor heat is going to take quite awhile to get to 70. Most things that you put off to add later will cost more later.

Makes me want to build one myself.
 

Dad

Founding Member
Founding Member
Thread starter
Joined
May 29, 2015
Posts
184
Likes
2
Points
103
I plan to use a house furnace so I can add ac in future in addition to floor heat, running tubes and propane burner. I don’t knit but need to get above 65 at times for curing some adhesives for the ice house business. The sips panels are already insulated and plan to blow in the ceiling myself. Agree with lights and outlets and have a plan for water at the bar as it is next to the bathroom. I am curious on more detail on helix additive besides it being junk, it meets code at 10lbs per yard of concrete in North Dakota.
 

SDMF

Founding Member
Founding Member
Joined
Apr 24, 2015
Posts
10,908
Likes
620
Points
438
I plan to use a house furnace so I can add ac in future in addition to floor heat, running tubes and propane burner. I don’t knit but need to get above 65 at times for curing some adhesives for the ice house business.

You get a special exception for actually NEEDING the heat. ;:;rofl

AC is an oft-overlooked but very necessary function within a shop IMO, especially for keeping humidity down. Steel things are less prone to rust. Powder and primers keep indefinitely in a climate controlled environment.
 


Kurtr

Founding Member
Founding Member
Joined
Apr 12, 2015
Posts
18,239
Likes
1,971
Points
648
Location
Mobridge,Sd
I plan to use a house furnace so I can add ac in future in addition to floor heat, running tubes and propane burner. I don’t knit but need to get above 65 at times for curing some adhesives for the ice house business. The sips panels are already insulated and plan to blow in the ceiling myself. Agree with lights and outlets and have a plan for water at the bar as it is next to the bathroom. I am curious on more detail on helix additive besides it being junk, it meets code at 10lbs per yard of concrete in North Dakota.


i have used it on alot of projects but on floors or suspended floors. Footings and walls i would use rebar as it is really not that labor intensive and i think works better in those applications. What does the ready mix company sell it for per bag as it comes in 10 pound bags and needs to be added while batching. If you add it after you end up with big balls of fiber mesh it is not distributed evenly through out the mix and serves no purpose.
 

LBrandt

★★★★★ Legendary Member
Joined
Apr 3, 2016
Posts
10,831
Likes
1,382
Points
498
Location
SE ND
Unless your related to FLASH your not blowing the insulation yourself. :::
 

eyexer

Founding Member
Founding Member
Joined
Apr 20, 2015
Posts
13,730
Likes
708
Points
428
Location
williston
I plan to use a house furnace so I can add ac in future in addition to floor heat, running tubes and propane burner. I don’t knit but need to get above 65 at times for curing some adhesives for the ice house business. The sips panels are already insulated and plan to blow in the ceiling myself. Agree with lights and outlets and have a plan for water at the bar as it is next to the bathroom. I am curious on more detail on helix additive besides it being junk, it meets code at 10lbs per yard of concrete in North Dakota.
is this a floating slab or do you have a 4' foundation?
 

Duckslayer100

Founding Member
Founding Member
Joined
Aug 11, 2015
Posts
4,611
Likes
189
Points
293
Location
ND's Flatter Half
If you need to to be more than 55 degrees in a shop, you don't need a shop, you need a knitting nook.

50-55 is typically the lowest recommended setting for a unit heater per manufacture spec. But ok there big shoots, thanks for the constructive insight. I'm sure it helped big time.
 

Captain Ahab

Founding Member
Founding Member
Joined
Apr 22, 2015
Posts
10,528
Likes
442
Points
418
Location
Timbuktu
I wouldn’t call it a shop, but my man cave sits at 67-68 all winter. My nat gas bill is minimal, so why not walk into a nice temp building to work on your stuff? I go in an out often so it would cycle a lot with big temp swings.
 


Ruttin

Founding Member
Founding Member
Joined
Apr 21, 2015
Posts
1,307
Likes
632
Points
293
Location
ND
The fiber mesh for the floor in my opinion leaves a not so pleasant "finish." You can see the fibers plain as day. I would stay away from it and use a good concrete sealer for the floor at least that is what I did when I built mine.

Also an electric winch on the ceiling has been one of the most handiest "tools" I installed as well. From hanging deer to working on sleds and atv's, it's been a back saver.
 
Last edited:

BrokenBackJack

Founding Member
Founding Member
Joined
May 13, 2015
Posts
9,131
Likes
4,399
Points
763
Location
Central, AZ
First question is where do you live?
Definitely go rebar, don't try to go the easy quick route. Rebar takes such little time and is worth its weight in gold.
Foam closed cell insulation in the walls. Blow in up in the ceiling is fine.
As stated plenty of outlets and floor drains.
Plan on where you might put in meat freezers or other cabinets in case you want to plug something in.
Water both hot and cold is great in the shop.
Do heat and a/c all at once and your done. Did it with ours and so glad we did.
We also went 12' walls with 10' high doors just in case. Have a 20'x10' door on the double stall and on the 40' single stall lane we have a 14'x10' on each end of the long stall. Comes in handy and glad we put in the 2 doors on that stall.
Plenty of LED overhead lights. Also had them wire in for our cabinets and over head cabinets so we could put LED lights under the cabinets with each having separate switch for working on the bench.
Don't forget to wire in for overhead fans with wall switches to each one.
I know i am forgetting some things.
Our builder and electrician down here kept saying this is over kill on the things we done. Since we built our builder and electrician have brought many clients over to look at our setup and most have gone this route after seeing it and how handy it is. While we were doing it they kept telling us you aren't in ND anymore and i would just tell them what keeps you warm in the winter will keep you cool in the summer.
Not for everyone and just my 2 cents so good luck!
 

Traxion

Founding Member
Founding Member
Joined
May 29, 2015
Posts
1,634
Likes
242
Points
253
Location
Western Sodak
I would use rebar no matter what. I don't feel that fiber does anything close to what rebar does. I think there are applications for it but it does not replace rebar in it. I also agree with the finishing aspect, it makes it more difficult and is visible. Assuming you are burning the floor out with a power trowel, I certainly would not use it.

Make sure you insulate your slab properly from the outside. People seem to forget all the heat loss they can get from the outside. 2" foam up the exterior of the slab/thick edge is needed. You'll have to get a flashing bent for the top of it but it keeps a lot of loss from occurring.
 

Dad

Founding Member
Founding Member
Thread starter
Joined
May 29, 2015
Posts
184
Likes
2
Points
103
I am going floating slab, not sure everyone knows what helix is but it is metal fill additive, about like a box of nails you add to concrete. I am up the hill from Fargo so clay and grave base. I am going 12” gravel under slab. I am going two 10x12 doors on end wall with 12ft ceiling. One lane for boats and other for ice gear. I would go deeper but space didn’t allow.
 

TakItEz

Founding Member
Founding Member
Joined
Oct 28, 2015
Posts
77
Likes
7
Points
108
Put poly under your slab, its a cheap way to reduce any moisture from wicking up through the slab.
 


Recent Posts

Friends of NDA

Top Posters of the Month

  • This month: 159
  • This month: 133
  • This month: 116
  • This month: 109
  • This month: 104
  • This month: 87
  • This month: 82
  • This month: 76
  • This month: 75
  • This month: 74
Top Bottom