Looking into building a new house. Anybody recently done this or had is done? I know it can vary quite a bit. Looking at a 2200 sqft upper with a poured unfinished basement. I would be doing the electrical and possibly the HVAC myself. Everything else I would pay to have done. How much ya think this would cost me? Thanks!