What's new
Forums
Members
Resources
Whopper Club
Politics
Pics
Videos
Fishing Reports
Classifieds
Log in
Register
What's new
Search
Members
Resources
Whopper Club
Politics
Menu
Log in
Register
Install the app
Install
Forums
Fishing
Boat Fishing
Montana Snowpack
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="tikkalover" data-source="post: 479330" data-attributes="member: 600"><p><h2>Garrison Dam Spillway Improvement Project</h2><p>The U.S. Army Corps of Engineers, Omaha District, completed a Dam Safety Modification Study in June 2023 at Garrison Dam, near Riverdale, North Dakota. The study evaluated what repairs or improvements are needed to address structural concerns at certain places at the project, primarily within the spillway. These concerns pose risks to USACE’s ability to operate the dam during extreme flood events. The Dam Safety Modification Study also recommended a risk management plan to support the expeditious and cost-effective reduction of the risk posed by these concerns. Recommendations include modifications to the spillway that collectively address dam safety concerns with modernized designs. Key elements of these recommendations include:</p><ul> <li data-xf-list-type="ul">the full replacement of the spillway’s drainage system to remove manhole covers from inside the spillway to prevent the covers from dislodging during future spillway operations.</li> <li data-xf-list-type="ul">placement of a reinforced concrete overlay in the spillway chute and stilling basin to ensure the spillway can safely pass extreme flows</li> <li data-xf-list-type="ul">armoring the area behind the spillway chute walls to reduce potential for erosion during extreme flows</li> <li data-xf-list-type="ul">raising the spillway abutment monoliths to prevent overtopping which can lead to erosion and failure of the structure</li> <li data-xf-list-type="ul">constructing a deflector beam to deflect the overflow from spillway gates</li> <li data-xf-list-type="ul">modifying the gates’ trunnion hubs to ensure they are structurally sound, and</li> <li data-xf-list-type="ul">improving the system that deices the gates so they remain operational during winter conditions. </li> </ul><p>Over approximately the next six years, USACE will conduct field investigations to collect data to inform the detailed design and develop plans and specifications that are necessary to award a contract to complete these recommendations. As of 2023, construction is anticipated to begin in 2029 and take several years to complete.</p><p>In the near term, USACE also plans to construct an additional line of drains on the dam’s west abutment to address a slope stability and seepage concern that was evaluated in the study. Construction could begin in 2025 and would last one season.</p></blockquote><p></p>
[QUOTE="tikkalover, post: 479330, member: 600"] [HEADING=1]Garrison Dam Spillway Improvement Project[/HEADING] The U.S. Army Corps of Engineers, Omaha District, completed a Dam Safety Modification Study in June 2023 at Garrison Dam, near Riverdale, North Dakota. The study evaluated what repairs or improvements are needed to address structural concerns at certain places at the project, primarily within the spillway. These concerns pose risks to USACE’s ability to operate the dam during extreme flood events. The Dam Safety Modification Study also recommended a risk management plan to support the expeditious and cost-effective reduction of the risk posed by these concerns. Recommendations include modifications to the spillway that collectively address dam safety concerns with modernized designs. Key elements of these recommendations include: [LIST] [*]the full replacement of the spillway’s drainage system to remove manhole covers from inside the spillway to prevent the covers from dislodging during future spillway operations. [*]placement of a reinforced concrete overlay in the spillway chute and stilling basin to ensure the spillway can safely pass extreme flows [*]armoring the area behind the spillway chute walls to reduce potential for erosion during extreme flows [*]raising the spillway abutment monoliths to prevent overtopping which can lead to erosion and failure of the structure [*]constructing a deflector beam to deflect the overflow from spillway gates [*]modifying the gates’ trunnion hubs to ensure they are structurally sound, and [*]improving the system that deices the gates so they remain operational during winter conditions. [/LIST] Over approximately the next six years, USACE will conduct field investigations to collect data to inform the detailed design and develop plans and specifications that are necessary to award a contract to complete these recommendations. As of 2023, construction is anticipated to begin in 2029 and take several years to complete. In the near term, USACE also plans to construct an additional line of drains on the dam’s west abutment to address a slope stability and seepage concern that was evaluated in the study. Construction could begin in 2025 and would last one season. [/QUOTE]
Verification
What is the most common fish caught on this site?
Post reply
Recent Posts
Tire ? number 641
Latest: Skeeter
5 minutes ago
I HATE coyotes!!!!
Latest: bigv
5 minutes ago
Buying gold and silver.
Latest: Maddog
13 minutes ago
Montana Snowpack
Latest: Maddog
17 minutes ago
Drone defense!?!
Latest: Lycanthrope
41 minutes ago
New member
Latest: Fritz the Cat
Today at 2:05 PM
Sak
West End
Latest: cooter00
Today at 1:30 PM
ND concealed Weapons Permit
Latest: ktm450
Today at 9:12 AM
N
Anyone see that one coming
Latest: ndlongshot
Today at 8:15 AM
A
Turkey Time
Latest: AR-15
Today at 5:19 AM
2026 SCI RRV Banquet
Latest: Callem'In
Yesterday at 5:29 PM
What are you listening to these days?
Latest: Lycanthrope
Yesterday at 12:22 PM
F
Harwood ND AI business
Latest: Fester
Yesterday at 12:19 PM
NFL News (Vikings)
Latest: Eatsleeptrap
Yesterday at 6:14 AM
David/Marine YT
Latest: svnmag
Sunday at 11:22 PM
Cryptocurrency and stockmarket
Latest: Kurtr
Sunday at 7:02 PM
YT A10 2025
Latest: Zogman
Sunday at 7:58 AM
Outdoor photo request
Latest: shorthairsrus
Friday at 11:46 PM
Weather/temps
Latest: tikkalover
Friday at 8:45 PM
Catfish anyone?
Latest: svnmag
Friday at 8:07 PM
Panic buying.
Latest: Jiffy
Friday at 6:46 PM
R
Male Golden Retriever.
Latest: riverview
Friday at 5:23 PM
DEF fluid by the barrel
Latest: wslayer
Friday at 10:38 AM
Friends of NDA
Forums
Fishing
Boat Fishing
Montana Snowpack
Top
Bottom