What's new
Forums
Members
Resources
Whopper Club
Politics
Pics
Videos
Fishing Reports
Classifieds
Log in
Register
What's new
Search
Members
Resources
Whopper Club
Politics
Menu
Log in
Register
Install the app
Install
Forums
General
General Discussion
Mandan Data center pushback
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="jer79" data-source="post: 498252" data-attributes="member: 573"><p>Sounds like from other sources i found, the aberdeen water is also being used for construction purposes, water trucks possibly and whatever... I believe there is a large mancamp there and maybe ellendale put a cap on their usage? I dont know but, could it be that they gotta get it somewhere else for now because they would exceed a limit.</p><p></p><p>why would the water come from aberdeen? and not ellendale or on site?</p><h4>Copilot said:</h4><p></p><p></p><p></p><p>There are a few plausible reasons, and the publicly reported facts point more toward <strong>water quality and availability</strong> than simple proximity.</p><p>What has been reported is that <strong>Aberdeen sold more than 1 million gallons of treated municipal water</strong> to the Applied Digital project, and local Ellendale officials said the water was being used for the campus cooling system commissioning and fill process. Those reports do not explicitly state <em>why Aberdeen was chosen over Ellendale.</em></p><p>The likely reasons are:</p><ol> <li data-xf-list-type="ol"><strong>Treated water quality</strong><ul> <li data-xf-list-type="ul">Large closed-loop cooling systems typically require very clean water to avoid corrosion, mineral scaling, and biological growth.</li> <li data-xf-list-type="ul">Municipal water systems can often deliver water with known and consistent chemistry.</li> <li data-xf-list-type="ul">If Aberdeen could provide the required specifications in large volumes, it may have been more attractive than local sources.</li> </ul></li> <li data-xf-list-type="ol"><strong>Small-town system limitations</strong><ul> <li data-xf-list-type="ul">Ellendale is a small community.</li> <li data-xf-list-type="ul">Drawing hundreds of thousands or millions of gallons quickly from a local municipal system could place stress on local infrastructure, storage, or fire protection reserves.</li> <li data-xf-list-type="ul">Purchasing from a larger municipal system avoids that issue.</li> </ul></li> <li data-xf-list-type="ol"><strong>Timing during construction</strong><ul> <li data-xf-list-type="ul">The water was reportedly trucked during construction and commissioning.</li> <li data-xf-list-type="ul">It may have been faster to purchase bulk loads from an available supplier than to build and permit temporary on-site treatment systems.</li> </ul></li> <li data-xf-list-type="ol"><strong>On-site well water may require treatment</strong><ul> <li data-xf-list-type="ul">Groundwater is often available in southeast North Dakota, but cooling-system-grade water may require extensive treatment to remove hardness, iron, manganese, or other dissolved minerals.</li> <li data-xf-list-type="ul">Depending on the chemistry, buying treated municipal water can be cheaper than treating large volumes of raw groundwater.</li> </ul></li> </ol><p>An interesting point is that if the Ellendale campus truly operates as the <strong>closed-loop, waterless system</strong> that Applied Digital and BASX have described, then the million-plus gallons trucked from Aberdeen would represent mostly an <strong>initial fill and commissioning expense</strong>, not a recurring annual need.</p><p>Looking at it from an engineering perspective, I'd be surprised if the reason was simply "Ellendale doesn't have enough water." More likely, the project needed a large volume of <strong>known-quality treated water delivered on a specific schedule</strong>, and Aberdeen was willing and able to supply it.</p><p>What's especially interesting is that if the campus eventually contains roughly <strong>1 million gallons of coolant inventory</strong>, the Aberdeen deliveries may actually give us a rough clue about the scale of the cooling system, even though neither Applied Digital nor the permitting documents I've found publicly disclose the final coolant volume.</p><p></p><h2><a href="https://fargoinc.com/applied-digital-north-dakota-answers-the-hard-questions?fbclid=IwY2xjawUqef1leHRuA2FlbQIxMABwZG9mAWJyaWQRMTBmQWpyOVQxY2xSWm14aEtzcnRjBmFwcF9pZBAyMjIwMzkxNzg4MjAwODkyAAEe40GKLhJvbkihpm2GweLSOhjnqIBkndtk5w_gDsZ_UnzLhgTYXq72g0WXLXw_aem_ToibxK0nUQ8I82BE0BDEMg" target="_blank">https://fargoinc.com/applied-digital-north-dakota-answers-the-hard-questions?fbclid=IwY2xjawUqef1leHRuA2FlbQIxMABwZG9mAWJyaWQRMTBmQWpyOVQxY2xSWm14aEtzcnRjBmFwcF9pZBAyMjIwMzkxNzg4MjAwODkyAAEe40GKLhJvbkihpm2GweLSOhjnqIBkndtk5w_gDsZ_UnzLhgTYXq72g0WXLXw_aem_ToibxK0nUQ8I82BE0BDEMg</a></h2></blockquote><p></p>
[QUOTE="jer79, post: 498252, member: 573"] Sounds like from other sources i found, the aberdeen water is also being used for construction purposes, water trucks possibly and whatever... I believe there is a large mancamp there and maybe ellendale put a cap on their usage? I dont know but, could it be that they gotta get it somewhere else for now because they would exceed a limit. why would the water come from aberdeen? and not ellendale or on site? [HEADING=3]Copilot said:[/HEADING] There are a few plausible reasons, and the publicly reported facts point more toward [B]water quality and availability[/B] than simple proximity. What has been reported is that [B]Aberdeen sold more than 1 million gallons of treated municipal water[/B] to the Applied Digital project, and local Ellendale officials said the water was being used for the campus cooling system commissioning and fill process. Those reports do not explicitly state [I]why Aberdeen was chosen over Ellendale.[/I] The likely reasons are: [LIST=1] [*][B]Treated water quality[/B] [LIST] [*]Large closed-loop cooling systems typically require very clean water to avoid corrosion, mineral scaling, and biological growth. [*]Municipal water systems can often deliver water with known and consistent chemistry. [*]If Aberdeen could provide the required specifications in large volumes, it may have been more attractive than local sources. [/LIST] [*][B]Small-town system limitations[/B] [LIST] [*]Ellendale is a small community. [*]Drawing hundreds of thousands or millions of gallons quickly from a local municipal system could place stress on local infrastructure, storage, or fire protection reserves. [*]Purchasing from a larger municipal system avoids that issue. [/LIST] [*][B]Timing during construction[/B] [LIST] [*]The water was reportedly trucked during construction and commissioning. [*]It may have been faster to purchase bulk loads from an available supplier than to build and permit temporary on-site treatment systems. [/LIST] [*][B]On-site well water may require treatment[/B] [LIST] [*]Groundwater is often available in southeast North Dakota, but cooling-system-grade water may require extensive treatment to remove hardness, iron, manganese, or other dissolved minerals. [*]Depending on the chemistry, buying treated municipal water can be cheaper than treating large volumes of raw groundwater. [/LIST] [/LIST] An interesting point is that if the Ellendale campus truly operates as the [B]closed-loop, waterless system[/B] that Applied Digital and BASX have described, then the million-plus gallons trucked from Aberdeen would represent mostly an [B]initial fill and commissioning expense[/B], not a recurring annual need. Looking at it from an engineering perspective, I'd be surprised if the reason was simply "Ellendale doesn't have enough water." More likely, the project needed a large volume of [B]known-quality treated water delivered on a specific schedule[/B], and Aberdeen was willing and able to supply it. What's especially interesting is that if the campus eventually contains roughly [B]1 million gallons of coolant inventory[/B], the Aberdeen deliveries may actually give us a rough clue about the scale of the cooling system, even though neither Applied Digital nor the permitting documents I've found publicly disclose the final coolant volume. [HEADING=1][URL]https://fargoinc.com/applied-digital-north-dakota-answers-the-hard-questions?fbclid=IwY2xjawUqef1leHRuA2FlbQIxMABwZG9mAWJyaWQRMTBmQWpyOVQxY2xSWm14aEtzcnRjBmFwcF9pZBAyMjIwMzkxNzg4MjAwODkyAAEe40GKLhJvbkihpm2GweLSOhjnqIBkndtk5w_gDsZ_UnzLhgTYXq72g0WXLXw_aem_ToibxK0nUQ8I82BE0BDEMg[/URL][/HEADING] [/QUOTE]
Verification
What is the most common fish caught on this site?
Post reply
Recent Posts
Gasoline pump prices
Latest: Davy Crockett
Today at 9:11 PM
Scheels Bismarck
Latest: Obi-Wan
Today at 8:36 PM
DUI Attorney
Latest: Obi-Wan
Today at 8:31 PM
J
Mandan Data center pushback
Latest: jer79
Today at 8:29 PM
ESOX
Latest: SDMF
Today at 8:24 PM
NFL News (Vikings)
Latest: eyexer
Today at 6:31 PM
SOLD
2007 Ford Taurus
Latest: Zogman
Today at 5:03 PM
K-Drill Blade Sharpening Gone
Latest: Slappy
Yesterday at 12:02 PM
RAIN!!!!
Latest: KDM
Yesterday at 9:29 AM
Tailrace
Latest: MSA
Yesterday at 8:22 AM
L
Jap Beatles
Latest: LBrandt
Monday at 1:40 PM
N
Soybeans
Latest: ndlongshot
Monday at 1:35 PM
Guys with a Yeti....
Latest: johnr
Monday at 10:30 AM
Left Hand Remington Stocks
Latest: SupressYourself
Monday at 8:41 AM
What are you listening to these days?
Latest: svnmag
Sunday at 11:14 PM
Banks Stump Feeder
Latest: Shockwave
Saturday at 11:24 PM
FLOCK Cameras...Thoughts
Latest: Jiffy
Saturday at 9:51 PM
L
EHD is back..AGAIN!
Latest: LBrandt
Friday at 6:03 PM
D
Any youth hunter stories?
Latest: dsharp83
Friday at 12:20 PM
Sale
6.5 Creed Barrel - Savage
Latest: SupressYourself
Friday at 8:39 AM
Sale
4 Youth Model rifles
Latest: Lycanthrope
Thursday at 12:11 PM
Friends of NDA
Forums
General
General Discussion
Mandan Data center pushback
Top
Bottom