Well, started a man cave project and with covid killing summer I am going all in solo. So far I have a 40x52 dug out and moving gravel. I am using ez forms and was wondering if anyone has experience with “helix” additive in the cement instead of laying rebar?
I made the decision to spend more on material and do it myself vs labor, some days I feel like that was a mistake, but love that it will be made by me.
Sips walls
ez forms and floor heat
rafters, blow insulation, and steel roof - interior and exterior
bathroom, septic - code sucks on this and may just do holding tank.
floor drains
bar
any ideas or mistakes made for list above let me know.
I made the decision to spend more on material and do it myself vs labor, some days I feel like that was a mistake, but love that it will be made by me.
Sips walls
ez forms and floor heat
rafters, blow insulation, and steel roof - interior and exterior
bathroom, septic - code sucks on this and may just do holding tank.
floor drains
bar
any ideas or mistakes made for list above let me know.