Did you notice the door is like 2ft off the ground?
Screenshot 2026-08-26 070702.png
You place fill gravel to boc and you also have positive drainage when you finish grading the outside. Smart construction
 




Kurtr

Founding Member
Founding Member
Joined
Apr 12, 2015
Posts
20,818
Likes
6,302
Points
1,008
Location
Mobridge,Sd
I get maybe 6 or 8 inches, thats gonna be a lot of fill to get it to the metal!
You need at least 6 inches of fill under the concrete then you add the six inches for the concrete and its really not that much. Having built alot of pads no one ever complains about water draining its the ones that want flat to save a couple bucks on fill that always have the problems
 

Recent Posts

Friends of NDA

Top Posters of the Month

  • This month: 322
  • This month: 235
  • This month: 187
  • This month: 85
  • This month: 60
  • This month: 58
  • This month: 41
  • This month: 37
  • This month: 36
  • This month: 32
Top Bottom