You place fill gravel to boc and you also have positive drainage when you finish grading the outside. Smart constructionDid you notice the door is like 2ft off the ground?![]()
You place fill gravel to boc and you also have positive drainage when you finish grading the outside. Smart constructionDid you notice the door is like 2ft off the ground?![]()
Hopefully Steps were part of the bidDid you notice the door is like 2ft off the ground?![]()
I get maybe 6 or 8 inches, thats gonna be a lot of fill to get it to the metal!You place fill gravel to boc and you also have positive drainage when you finish grading the outside. Smart construction
495 yards counting apron and outside. Floodplain elevation requiredI get maybe 6 or 8 inches, thats gonna be a lot of fill to get it to the metal!
F495 yards counting apron and outside. Floodplain elevation required
The ABSOLUTE WORST thing anyone can do is build a building to low and fight drainage run off for ever. 6" to 12" even 18" of fill now will save decades of water issue headaches.I get maybe 6 or 8 inches, thats gonna be a lot of fill to get it to the metal!