Contemplating a shop build

Kurtr

Founding Member
Founding Member
Joined
Apr 12, 2015
Posts
20,816
Likes
6,301
Points
1,008
Location
Mobridge,Sd
Did you notice the door is like 2ft off the ground?
Screenshot 2026-08-26 070702.png
You place fill gravel to boc and you also have positive drainage when you finish grading the outside. Smart construction
 




Obi-Wan

Founding Member
Founding Member
Joined
May 15, 2015
Posts
10,676
Likes
8,717
Points
1,008
Location
Bismarck
I get maybe 6 or 8 inches, thats gonna be a lot of fill to get it to the metal!
The ABSOLUTE WORST thing anyone can do is build a building to low and fight drainage run off for ever. 6" to 12" even 18" of fill now will save decades of water issue headaches.
 

Recent Posts

Friends of NDA

Top Posters of the Month

  • This month: 322
  • This month: 235
  • This month: 187
  • This month: 84
  • This month: 58
  • This month: 58
  • This month: 41
  • This month: 37
  • This month: 36
  • This month: 32
Top Bottom