Did you notice the door is like 2ft off the ground?
Screenshot 2026-08-26 070702.png
You place fill gravel to boc and you also have positive drainage when you finish grading the outside. Smart construction
 




Obi-Wan

Founding Member
Founding Member
Joined
May 15, 2015
Posts
10,681
Likes
8,724
Points
1,008
Location
Bismarck
I get maybe 6 or 8 inches, thats gonna be a lot of fill to get it to the metal!
The ABSOLUTE WORST thing anyone can do is build a building to low and fight drainage run off for ever. 6" to 12" even 18" of fill now will save decades of water issue headaches.
 

Kurtr

Founding Member
Founding Member
Joined
Apr 12, 2015
Posts
20,824
Likes
6,313
Points
1,008
Location
Mobridge,Sd
I get maybe 6 or 8 inches, thats gonna be a lot of fill to get it to the metal!
You need at least 6 inches of fill under the concrete then you add the six inches for the concrete and its really not that much. Having built alot of pads no one ever complains about water draining its the ones that want flat to save a couple bucks on fill that always have the problems
 

Ruttin

Founding Member
Founding Member
Joined
Apr 21, 2015
Posts
2,501
Likes
4,973
Points
773
Location
ND
Yes. Floor drain but no water at this point
You might want to rough in a spot for a bathroom before the pour...or at least place at least a 3" pvc pipe where you would like the water to come in at. Then all you have to do is "fish" the water line through.
 


Recent Posts

Friends of NDA

Top Posters of the Month

  • This month: 335
  • This month: 235
  • This month: 206
  • This month: 85
  • This month: 66
  • This month: 60
  • This month: 42
  • This month: 41
  • This month: 39
  • This month: 36
Top Bottom