thanks for the info. sometimes pays to ask and listen before criticizing. I am back to wondering, "Why shut it down now when it seems like it's nearly completed?" Don't bother, I have a pretty good idea to the answer to that question.
 


jdinny

Founding Member
Founding Member
Joined
May 20, 2015
Posts
2,241
Likes
131
Points
288
there was a bit on KFYR last night that talked about halting it as well.....as of this past sunday is was still going so not sure if it has since halted or not
 

Davey Crockett

Founding Member
Founding Member
Joined
Apr 22, 2015
Posts
13,841
Likes
1,342
Points
563
Location
Boondocks
Pretty sure more than one company is toying with the idea of deploying an offshore jack-up rig.
 

eyexer

Founding Member
Founding Member
Joined
Apr 20, 2015
Posts
13,730
Likes
708
Points
438
Location
williston
there is no need to do that. The horizontals can pretty much cover anything under the lake they want. And I don't think that rig is going to be shut down. Just a bunch of noise for nothing I think.
 


Davey Crockett

Founding Member
Founding Member
Joined
Apr 22, 2015
Posts
13,841
Likes
1,342
Points
563
Location
Boondocks
Your right , I hadn't looked at the maps and didn't realize there were that many legs under the lake. I wonder why in this case that extra 200 feet was so crucial ? Why would they not be a good sport about it and set the wells back 200' ?



pixel.gif


- - - Updated - - -

I tried posting the NDIC map but there are about 10 sections in the middle that haven't been drilled yet.
 

lunkerslayer

Founding Member
Founding Member
Joined
Apr 12, 2015
Posts
19,108
Likes
3,104
Points
858
Location
Cavalier, ND
The company I am working for is in need of some experienced surveyors for proposed drilling pads. It's insane how big these pads are 1200x900 feet with the capacity to drill 26 wells 50 feet apart. There are hundreds of these pads being proposed for potential building if oil prices go up
 

NodakBuckeye

Founding Member
Founding Member
Joined
May 15, 2015
Posts
2,816
Likes
42
Points
261
Location
Watford City
The main issue I can see is washing out flowlines and misting fluids drift to the lake. Should not happen with competent flowback and babysitters on location; however, you can wash a choke or a 90 after flowback has been released and if you have less than stellar babysitters on, especially at night, seems 99% of issues happen then.
 

WormWiggler

Founding Member
Founding Member
Joined
Apr 13, 2015
Posts
7,191
Likes
455
Points
358
As far as oil related possible problems go I don't think a drilling rig is in the the top ten. Of all the things that go wrong on a rig, having oil spilling all over the place is a rarity. I'd be more nervous about a piece of pipe flying in my direction.

I would be a lot more concerned when the completion rig moves into to do clean outs. Not sure what Slawson has for actual procedures. But it usually done underbalanced. Workover rigs can be very limited in fluid handling equipment and generally cannot just weight up for control. That and the fact they are less trained, less supervised, and very prone to put speed ahead of everything else. You would likely see pipe getting launched 50x more on a workover rig than a drilling rig.
 

Recent Posts

Friends of NDA

Top Posters of the Month

  • This month: 71
  • This month: 52
  • This month: 48
  • This month: 38
  • This month: 36
  • This month: 34
  • This month: 31
  • This month: 30
  • This month: 28
  • This month: 23
Top Bottom